Show figures in
English
INDUSTRIES · ENERGY & INFRASTRUCTURE

Big projects, big contracts, and small leaks that add up.

Power, oil and gas, and infrastructure businesses spend through large contracts, long projects and remote sites. We test every payment, measurement and claim against the contract, site by site.

MONEY LINEContract overpayments stopped, fuel and stock losses cut and project costs controlled, by site and project.

01Where money leaks in energy and infrastructure

01SAVE $

Contractor claims

Running bills, variations and escalations paid above what the contract allows.

02SAVE $

Fuel and consumables

Fuel, lubricants and spares issued above what the equipment used.

03SAVE $

Capex projects

Projects that overrun without approval, and assets paid for but never commissioned.

04EARN $

Billing and collections

Meter readings, tariffs and dues that leave revenue on the table.

02Twelve use cases

Twelve use cases across contracts, sites, billing and compliance

CONTRACTS AND PROJECTS
  • Variation and escalation checksContracts, bills, indices
  • Measurement anomaliesRunning bills, site records
  • Capex overrun signalsProject budgets, commitments
OPERATIONS AND SITES
  • Fuel reconciliationFuel issues, equipment hours, GPS
  • Spares at remote sitesStores, issues, transfers
  • Maintenance spend by assetWork orders, invoices, asset data
REVENUE AND BILLING
  • Meter and tariff checksMeter data, tariffs, bills
  • Unbilled connectionsConnection records, billing
  • Dues and receivables ageingCustomer ledgers, collections
COMPLIANCE AND THIRD PARTIES
  • Contractor and sub-vendor screeningVendor master, registries
  • Permits and penaltiesPermits, obligations, notices
  • Duplicate and split paymentsVendor master, invoices, payments

Each use case names the data it needs. Site, meter and equipment data usually sit outside the ERP.

03One case

One case: running bills on a large project

Projects: every bill is signed. The quantities don’t add up.

Situation
An infrastructure developer; contractor running bills checked by site engineers, with a sample reviewed by audit.
What a sample misses
Each bill has a measurement and a signature. The leak is in quantities billed twice across bills, or above the design.
Data and technique
Every running bill matched to the contract schedule, the design quantities and earlier bills; escalation recalculated from the index.
Typical findings
The same quantity claimed in two bills; escalation on materials the client supplied; variations paid before approval.
Control fix
Cumulative quantities checked against the design before each bill is paid; escalation calculated by the system, not the contractor.

On a long project, the overpayment hides in the running total, not in any one bill.

Illustrative composite case, read-only access.

04Tests to run first

Contracts, sites and billing: 12 tests to run first

Contracts and projectsSites and billing
Quantities billed above the design or the contractFuel issued above what the equipment ran
The same item claimed in two running billsSpares issued to assets that don’t use them
Escalation on materials the client suppliedStock moving between sites with no receipt
Variations paid before they were approvedMeters with readings that never change
Contractor advances not recoveredTariffs billed below the approved rate
Retention released before the defects period endsConnections live but not billed

Thresholds are set for each site and project, and tuned on the results.

05Earn $ and Save $ in energy and infrastructure

PROOF

An infrastructure developer stopped USD 1.4 Mn of duplicate and above-design quantities in contractor running bills across 3 projects.

Where is your money hiding?

Where is your money hiding?

Three minutes to an estimate. Thirty minutes to a plan. Six weeks to valued findings on your own data.